{config.cms_name} Home / Cases / Clearing Work for the Terminal Area Project of the Relocation Project of Zhanjiang Airport in Guangdong Province
Cases
 Clearing Work for the Terminal Area Project of the Relocation Project of Zhanjiang Airport in Guangdong Province

Clearing Work for the Terminal Area Project of the Relocation Project of Zhanjiang Airport in Guangdong Province

Project Location: Zhanjiang, Guangdong

Scope of contract: Top-up primer; Inorganic zinc-rich primer 40um with 85% zinc powder content; Epoxy resin sealing paint 30um; Epoxy mica intermediate paint 100um; 2×30um acrylic polyurethane topcoat can be applied. Water-based ultra-thin fireproof coating

Fire resistance limit: 2.0 hours; Oil-based ultra-thin fireproof coating

Fire resistance limit: 2.0 hours; Gypsum-based thick fireproof coating

Fire resistance for 3 hours; Purchase and installation of safety nets; 2×30um acrylic modified polysiloxane topcoat can be coated. Water-based ultra-thin fireproof coating for 1.5 hours; Oil-based ultra-thin fireproof coating for 1.5 hours

Building area: 3,323,256 square meters

Contract signing date: January 26, 2021

Contact Us