Project Location: Shenzhen, Guangdong
Contract scope: Repair and cleaning of primer and intermediate coat; Aliphatic polyurethane topcoat 60um; Acrylic polysiloxane topcoat 60um; Fireproof coating 3h thick type Fireproof coating 2h thin type (solvent-based) Fireproof coating 2h thin type (water-based) Fireproof coating 1.5h thin type (solvent-based) Fireproof coating 1.5h thin type (water-based) Apply putty; Safety net laying and materials
Building area: 2,726,875 square meters
Contract signing date: July 28, 2021