Founded in 1997, Zhejiang Bolei Coatings Co., Ltd. is a subsidiary of Bolei Industrial Group, with multiple subsidiaries engaged in coatings manufacturing, construction services, new material development, and international trade.
As a professional paint manufacturer based in China, we specialize in anti-corrosion coatings, fireproof coatings, emulsion paints, epoxy floor paints, and JS waterproof paints, widely applied in both industrial and construction sectors.
With advanced production facilities, a strict quality control system, and a stable raw material supply chain, we deliver high-quality and cost-competitive coating products and engineering solutions to our clients worldwide.
Product Specifications (Reference)
Composition: Cement + Polymer Emulsion (JS Emulsion) + Functional Additives
Color: Gray/Cement Gray
Application: Paste/Slurry
Drying Time: Surface Dry 1–2 hours (25°C)
Fully Dry: 7 days (25°C)
Coating Thickness: Single layer 1–2 mm (Multiple layers recommended, cumulative thickness 2–3 mm)
Tensile Strength: ≥1.0 MPa
Elongation at Break: ≥200%
Water Impermeability: 0.3 MPa, no leakage for 30 minutes
Adhesion: ≥1.0 MPa
Application Method: Brush, Roller, Squeegee
Applicable Temperature: 5–35°C
VOC Content: ≤50 g/L
Key Features
Excellent flexibility, adapts to micro-cracks and displacement in the substrate
High adhesion, excellent water and weather resistance
Multi-layer Coating forms a monolithic waterproof membrane
Water-based, environmentally friendly, low odor, and safe to apply
Suitable for waterproofing interior and exterior walls, roofs, and underground structures
Applications
Roof, balcony, and terrace waterproofing
Bathroom, kitchen, and basement waterproofing
Pool, tank, and reservoir waterproofing
Concrete, mortar, and other building substrates waterproofing
Application Instructions
1. Substrate must be solid, flat, dry, free of dust, grease, and loose particles.
2. Mix components A and B thoroughly according to the specified ratio before application.
3. Apply in two or more layers, each about 0.5mm thick; apply the next Paint after the previous Paint is dry.
4. Apply at 5–35℃, RH <85%, avoid rain washing.
5. Maintain the finished waterproof film for at least 7 days; keep it moist to enhance performance.
Scope of Application
Suitable for roofs, balconies, basements, bathrooms, pools, and various building structures for waterproofing.
Packaging & Storage
Package: Component A: 20kg bag, Component B: 20kg pail
Storage: Store sealed in a cool, dry place, avoiding freezing and direct sunlight.
Shelf Life: 12 months under sealed conditions at 25℃.



English















ENG
English